News

GridBeyond begins optimisation of Gore Street’s 400MWh first California BESS project

Energy-Storage.News · April Bonner · last updated
Optimiser GridBeyond, over the summer, began operating the 200MW/400MWh Big Rock Battery Energy Storage System (BESS) in El Centro, California, with Gore Street Energy Storage Fund (GSF).